Situation normal – for architects!
Invited to give an informal talk to Association of Consultant Architect councillors about the state of the profession earlier this year, I couldn’t help thinking about the last time we had war in the Middle East, massively fluctuating oil price rises, general global insecurity and chaotic domestic politics. That is to say 1973/4, writes Paul Finch.
Building Design ran a weekly update at the time called ‘How they are coping’, describing how practices were getting on with business despite all the bad things happening, including the three-day week. The feature was illustrated by a lit candle which diminished in height each week!
In retrospect, the worst thing about that period was inflation, both in terms of the domestic economy, but more particularly the building economy – which Prime Minister Edward Heath blamed for exacerbating wider economic woes. Inflation today, though evident is nothing like what it was, a point of comfort for anybody who can remember the 1970s.
In more recent decades, the profession has had to deal with the 2008 world financial crisis, the pandemic, Brexit and its uncertainties, and now Trumpian politics, war and always-with-us famine. And instead of irrelevant worries about vanishing oil resources, we have the global context of climate change and the move towards carbon-free energy sources.
A question of data
Talking of which, an interesting government initiative was recently launched, in conjunction with the RIBA, to do some thinking about the design of data centres. These are huge users of energy, so any competition should surely be thinking about this design challenge in the round: what will the energy sources be? The government would also like more thought given to the appearance and public elements of this new building type, more in keeping with the Victorian tradition of giving aesthetic distinction to infrastructure projects like pumping stations.

Rethinking Oil Rigs - Offshore Data Centres by Arup (WAFX Award - Re-use and Overall Winner 2023)
So far, the only truly creative idea about reconciliation of energy use and data centres is an idea from Arup, which won a World Architecture Festival award in 2023. This proposed the re-use of redundant oil rigs as under-water data centres. This brilliant proposition was accompanied by analysis of the global supply of oil-rigs which might be expected to become redundant over the next few decades.
This was not an architectural idea as such, but it had the characteristics of holistic thinking which frequently derives from collaborations with engineers of all descriptions.
Happily, we now have an example of a proposed data centre, in Scotland, where the idea for the design comes from Ancient Greece. The Stoa-inspired proposal by Graeme Nicholls, which could be mistaken for several buildings by David Chipperfield, shows that 19th century attitude is alive and well, and historicist in a good way. It is not an essay in why high-tech buildings can have thatched roofs. All power to the architect’s elbow, and to the serendipity that gave us this design, just as government recognized that this is an important architectural area. Working with the RIBA is, with any luck, a welcome sign that politicians might be starting to realise that architects can help make things better. And even better collaborating with engineers. Norman Foster’s recent work on the idea of nuclear-fusion installations to power urban blocks springs to mind.
Form, function and PFI
Another part of government is looking at an old architectural chestnut: should architectural function as well as title be protected? Post-Grenfell, the Building Safety Regulator has it in mind to have a single regulator for all construction professionals, which might mean the end of the Architects’ Registration Board in favour of a wider body. Protection of function, at least for complex projects, could require planning and Building Regulation applications to be made by suitably qualified persons. Actually, given what you can building without planning permission, perhaps anything requiring permission should be subject to the same regime. Let’s see.
An interesting area which will, in the near future, affect many public authorities, is the return of PFI-procured buildings to local authorities, health trusts and government departments. Typically, PFI schools, hospitals and other building types were provided on a 30-year lease, with the capital cost paid by the PFI consortium, and repair and maintenance undertaken as part of their contract.
At the end of the lease period, the building must (in theory) be handed back in the condition in which it was in year two of the contract, that is to say in good working order. The public sector body which now owns the building will no longer pay rent, but will assume responsibility for future repair and maintenance.
It would not be overly cynical to suggest that some PFI consortia will try to avoid spending anything towards the end of a contract, and there is therefore a likelihood of legal disputes about the condition of any particular building and who is responsible for what. No doubt surveys will be required, and in any event after 30 years there may be a review of building performance and whether capital works are needed – for example to deal with rising summer temperatures. They may be work here.
Housing and planning
There might also be work on the housing front, if incoming prime minister Andy Burnham’s ambitions in respect of affordable and social provision are anything other than political grandstanding. You wonder whether PFI might be used as a financial mechanism to provide an alternative to penalising housebuilders via affordability demands. The problem is that PFI got a bad name because of the poor drafting of contracts, which gave consortia too much power to benefit from lucrative re-financing, with no clawback for the public purse. With smart thinking, this might still be possible. Otherwise, perhaps Burnham will ask Homes England to be far more proactive rather than merely acting as a conduit for Whitehall cash sloshing its way through to housebuilders.
He might also have a word with Sir Stuart Lipton. The veteran developer has been working with an Arup team to develop a replicable housing model, the design of which is based on Marylebone mansion blocks: dense, not towers, popular, long-lasting. The concrete-frame/kit-of-parts proposition could be rolled out in any city. Repetition is a bonus, not a constraint.
Meanwhile, what of the planning system, our politicians’ favourite whipping-boy for explaining the shortage of housing and delays to infrastructure? Most of this is bogus, not the result of the system, but of policies which gum it up. An obvious example is putting carbon strategies into spatial planning instead of Building Regulations. Having done that, it seemed logical to include Biodiversity Net Gain in the same way, even though there is no reason why planners, with their geography and sociology degrees, should know anything about energy calculations or beehives. A good approach to speeding up spatial planning would be to see what you could take out, instead of what you could put in. If it involves numbers, move it to building control.
All to play for at Portland Place
Meanwhile, what about cultural matters? The most important project for the profession, since the building of 66 Portland Place as the RIBA headquarters in 1934, is the institute’s House of Architecture Project (HOAP), being led by two former RIBA presidents, Simon Allford and Jack Pringle. Jack is also chairman of the RIBA Trust Board (until the end of 2026), but will continue to work with Simon to retain continuity of client representatives and fundraising focus.
HOAP comprises three elements. First is the major retrofit of 66 Portland Place, occupied rent-free with more than 900 years on the lease still to run, courtesy of the Howard de Walden Estate. This is the first comprehensive improvement of the building, which has never had a sinking fund attached to it. It is scarcely surprising that it is costing £60 million to bring it up to 21st century standards, dealing with 27 level changes, asbestos, and M and E services no longer fit for purpose.
Improving the building is a byproduct of the main ambition of this part of the programme, which is to create a dynamic beacon for architectural activity and culture, attracting public and decision-makers as well as RIBA members in a new user-friendly, architecturally-focused environment. Temporary and permanent exhibition facilities throughout the building, an improved lecture hall, and the addition of a good-quality restaurant and bar (with a separate entrance on Weymouth Street) are designed to transform the look and feel of the institute. The Library is being restored and there will be an adjacent room showing off ‘treasures’ of the RIBA Collections. The building will be stuffed with architecture, pointing to great work being done by the profession, and how architecture can make the present and future better. The overall competition-winning design is by Renato Benedetti, with Purcell providing executive and conservation services. Gilbert Ash are contractors. Opening is planned for late 2028.

© Benedetti Architects
The second element is a digitisation programme which will make everything happening in Portland Place available online to members, and to the public at large. In addition, work on digitisation of the RIBA Collections, comprising 4.5 million drawings, photos, and models, will continue, helped by funds from bodies including Bloomberg. This is a major cultural project in its own right.
Both the above are part of an ongoing process. The third element of HOAP, whose fund-raising programme is likely to be formally launched towards the end of this year, is the ‘Museum of Architecture’, comprising the RIBA Collections referred to above.
Currently in the Victoria & Albert Museum and the London Archive (without-housing in facilities near Wandsworth Bridge), the V&A content has started moving to the National Archive at Kew, following a lease termination. The intention is then to create a permanent home for the collections in a central London location. This would include a gallery and visitor-friendly facilities, and would be intended to attract a significant public audience as well as the roughly 500 scholars a year that use the collections.
How the funding and management will work
It is not planned to spend member subscriptions on any of the HOAP elements, which in total are expected to cost about £100 million. The institute will fund £60 to £70 million directly, and plans to raise £30 million in respect of the Museum of Architecture, and parts of the digitisation programme.
The regeneration of 66 Portland Place is being funded via a bank loan, secured against the institute’s £100 million-plus endowment fund, created following the final disposal of NBS in 2020, and ring-fenced for use in respect of the aspirations of the RIBA charter. The endowment continues to make returns which can partly used to pay off the loan.
As mentioned above, parts of the digitisation programme are already funded, but the £30 million fund-raising target would help to continue this work.
The key target for fund-raising is the Museum of Architecture. The intention is to take space in a new central London development where there is a Section 106 requirement to accommodate a cultural use. Essentially, the developer receives planning permission for a building whose size is partly determined by the scale of the cultural use provision.
Importantly, these contracts, which are approved by the local planning authority, mean the cultural user obtains the space (a) for a minimum period of 50 years; (b) it is rent-free; and (c) it is service charge-free. Various relevant developments have been researched, and the institute is confident that it can secure such a space prior to the start of a formal fund-raising programme. The RIBA would probably have to pay the cost of the fit-out and certainly manage the costs of running the facility, possibly six or seven days a week, hence the fund-raising campaign.
The fund-raising target is ambitious, but then so is the project – an opportunity to reset the way the RIBA communicates with the public as well as members, focusing on its Charter objectives to advance architecture. The diminished influence of architects within the construction sector, and in their relationship with government, means the importance of cultural influence, via consistent demonstration of what architecture has to offer people, communities and the country, can scarcely be underestimated.
Anniversary time
RIBA Awards are 60 years old in 2026, and the Stirling Prize is 30. These awards are an important reminder not just of what the very best architecture can offer, but what good or very good ordinary can bring to all our lives. This sort of work will be prominently showcased in the new 66 Portland Place, and the architects will be invited to talk about their designs and celebrate their achievements, in a building which suffused with architectural ambition, an advertisement to the world about the benefits of design.